Skip to content

Events
& News.

Stay informed about our latest events, partnerships, and industry developments.

Prime Batteries at The smarter E Europe 2026

We're exhibiting at The smarter E Europe / ees Europe in Munich, June 23–25, 2026. Visit Stand B2.240 in Hall B2 to see our new cells and complete energy storage systems — cell-to-system, built in-house in the EU.

Prime Batteries at The smarter E Europe 2026 — Stand B2.240, Hall B2

10 Years Later: Europe's Battery Industry Enters a New Phase

This week at The Battery Show Europe in Stuttgart, one thing became clear: the European battery industry has entered a new phase. When we first exhibited nearly ten years ago, the halls were crowded with newcomers promising to become the next big player. Today the picture is very different — and Prime Batteries is still here, building at scale.

10 Years Later: Europe's Battery Industry Enters a New Phase

Live from The Battery Show Europe 2026

Engineering, software development, and sales were all represented at our stand. We introduced a new product line based on 21700 cells, manufactured at our EU Gigafactory, alongside our proprietary BMS and EMS — developed and calibrated specifically for our own cell data. The complete stack, in one place.

Live from The Battery Show Europe 2026

Prime Batteries Unveils the PBT CELLINDRIX 21700 Cylindrical Cell

At The Battery Show Europe 2026, for the first time at a major trade show, we presented our new cylindrical cells — now in production and manufactured entirely in-house. The PBT CELLINDRIX 21700 is built for applications where pack geometry, weight, and discharge behavior are tightly constrained: humanoid robots, drones, autonomous mobile robots, light electric vehicles, and powered industrial tools.

Prime Batteries Unveils the PBT CELLINDRIX 21700 Cylindrical Cell

Prime Batteries & Monsson Win Energy Partnership of the Year 2026

Together with Monsson Trading, we were recognized as Energy Partnership of the Year at the Energy CEO Forum & Awards Gala 2026. Partnerships like this are built long before they are awarded — through real projects, real commitments, and teams that deliver. Thank you to The Diplomat Bucharest for this recognition.

Prime Batteries & Monsson Win Energy Partnership of the Year 2026

Why Data Centers and Battery Storage Belong Together

Most of the operational costs in a large-scale data center are energy costs — and that changes everything about how one gets built and operated. Romania already generates significant renewable energy, but most of it is exported and loses its value before reaching a local consumer. Battery storage keeps that energy on the grid, available when and where it is needed most.

Why Data Centers and Battery Storage Belong Together